Our Track Record
+2GW of Reactivations Across 4 Continents
From procurement and project management to complete EPC delivery, we have successfully executed complex power generation and infrastructure projects across multiple continents.
Year
Location
Description
Capacity
Type
2025–2026
Undisclosed
Procurement & Project Management — acquisition, remanufacturing and recommissioning of 160 MW HFO Wärtsilä power plant
160 MW
HFO
2025–2026
Undisclosed
Procurement & Project Management — 200 MW combined cycle gas turbine (3 × 2x1 modules, 70 MW each)
200 MW
Combined Cycle
2024–2025
Guatemala
Technical evaluation for the development of two HFO power plants, total capacity 340 MW
340 MW
HFO
2023–2024
Malaysia
Procurement and logistics for a 100 MW power plant for Transafe
100 MW
Power Generation
2019–2022
Guatemala
EPC of 1,000 bbl/day oil refinery
1,000 bbl/day
Refinery
2019
Colombia
Project activities — Odin Petroil
—
Energy
2018
USA
Evaluation of fuel emulsion technologies for transportation and power generation applications; development of fuel emulsion customers
—
R&D
2017
USA
EPC of 1,000 HP gas compressor package for stranded crude oil flotation
1,000 HP
Gas
2017
USA
Brokerage of 7 MW wind farm
7 MW
Renewable
2016
USA
Evaluation of 200 MW gas power generation facility
200 MW
Gas
2016
Guatemala
Wastewater treatment facility, 2,400 m³/hour
2,400 m³/hr
Water
2016
USA
Supply of custom designed power generation systems for tactical vehicles for the US Army
—
Defense
2015
Venezuela
EPC 2 MW turbine generation for private industrial food processor
2 MW
Industrial
2014
Venezuela
EPC 2.8 MW base load power plant, including black start capability, PLC controls and paralleling switchgear for industrial application
2.8 MW
Industrial
2013
Venezuela
EPC 5.6 MW base load power plant, gas fired
5.6 MW
Gas
2013
Venezuela
EPC 3 MW (three 1,000 kW C32 Caterpillar generators) — principal and emergency power for private industrial application
3 MW
Industrial
2013
USA
2.7 MW procurement and removal for private customer, industrial application
2.7 MW
Industrial
2012
Guatemala
Evaluation of a 50 MW base load power plant for a private entity; preliminary evaluation, design and equipment selection
50 MW
Gas
2012
USA
10 MW procurement and removal; base load and emergency power for private entity
10 MW
Industrial
2012
Saudi Arabia
Purchase of 11.2 MW emergency power trailers; procurement, removal and logistics
11.2 MW
Emergency Power
2011
Japan
Inspection, purchase and decommission of 5 MW turbine generator
5 MW
Decommissioning
2011
Japan
Inspection, purchase and decommission of 6 MW turbine generator
6 MW
Decommissioning